Project Started in Skyway
Wednesday May 18th 2011
Not much happened after demo. One guy was framing a closet downstairs.The entrance to the deck on the main floor is blocked. The hallway to livingroom is opened. The old frames around doors and windows are removed.
https://picasaweb.google.com/112506832239218751378/SkywayProjectWeek3#
This week, the framer comes and reconfigures some of the floor plans. Living room and hallway is connected by opening up a door space on the dry wall. The old frames around doors and windows are removed to prepare for the new ones. Check out the pictures at Invest Now's album.